The Challenge
Healthcare Partners operated three medical facilities with combined energy costs exceeding $60,000/month. Each facility had different energy profiles, roof configurations, and operational requirements. They needed a unified energy strategy that could adapt to each location while maximizing savings across the portfolio.
The Solution
Promise Energy developed a portfolio-wide solar strategy with customized solutions for each facility. The project included rooftop and carport installations, with battery backup at the main facility for critical systems.
System Specifications
- Facility A: 500kW rooftop solar
- Facility B: 400kW carport solar with EV charging
- Facility C: 300kW rooftop + 500kWh battery backup
- Centralized monitoring across all sites
- Integrated with existing BMS systems
The Results
Project Timeline
Portfolio Assessment
3 weeks
Design & Engineering
4 weeks
Permitting (3 sites)
6 weeks
Phased Installation
8 weeks
System Integration
2 weeks